Start with essential equipment

List the equipment that must operate during an outage. Separate essential loads from optional ones. Computers, network equipment, printers and cooling devices have different demand profiles.

Account for starting and peak loads

Nameplate ratings, measured consumption and starting demand all matter. Equipment such as printers or motors may need more capacity at particular moments than their usual running demand suggests.

Agree your target runtime

An inverter rating describes output capability; it does not alone tell you how many hours the system will run. Battery capacity, usable energy, losses and load determine runtime.

Plan the installation

Ask for an itemised scope covering protection devices, cabling, earthing, ventilation, mounting and commissioning. A site assessment helps identify installation constraints.

Think about support

Confirm equipment warranty, maintenance needs and who to contact when a fault occurs. Keep your equipment schedule and handover documentation.

Prepared by Anjos Technology. Your equipment and site conditions determine the right specification; request an assessment for project-specific advice.