Design around the building

Map work areas, network cabinet locations and cable routes. Consider future desks and equipment instead of planning only for today.

Label and document

Consistent labels at the outlet and cabinet help technicians trace connections. Keep a port schedule and network layout with the handover records.

Test before handover

Installation quality should be checked with appropriate tests for the cable type and specified performance. Ask which results are included in the scope.

Leave room for maintenance

Orderly patching, suitable cabinet space and accessible cable routes make later troubleshooting and upgrades easier.

Review wireless alongside wired networks

Wi-Fi access points still depend on their wired uplinks and power arrangements. Plan both together for a coherent deployment.

Prepared by Anjos Technology. Your equipment and site conditions determine the right specification; request an assessment for project-specific advice.