What Should Your Office Inverter Keep Running During an Outage?
Start with the smallest group of devices that keeps essential work going. List the devices that must run together and the number of hours you need them. Have a qualified installer assess the site, equipment and circuits before selecting an inverter or battery.

Separate essential from deferrable work
Many offices can continue basic work with network equipment, a few laptops and selected lights. A printer, air conditioner or other higher-load appliance may belong on a separate circuit or run later. Include any external modem or switch that your essential devices depend on.
Record load and run time
Record quantities, equipment labels and what runs at the same time. Where appropriate, have the actual load measured. Inverter output, usable battery energy and desired runtime answer different questions. Starting surges, conversion losses and battery limits affect the result.
Illustrative example
Suppose a router, switch and workstations together draw 200 W and need three hours. That is about 600 Wh at the devices before allowing for losses, battery limits or load changes. This example is a planning input for the installer, and the final system size follows assessment.
Ask installers to show their assumptions
Compare which circuits are backed up, expected runtime under the agreed load, how batteries recharge, and what protection and handover are included. Share your current power sources and usual outage duration.
Buyer checklist
- Keep running: network equipment and essential workstations
- Use only if assessed: devices with higher loads or surges
- Record: watts, quantities and hours
- Verify: circuits, protection and charging assumptions
Watch the service explainer
Illustrative animation with English captions. Use the checklist above to apply it to your site.
Schneider Electric guidance on backup load sizing
Talk to Anjos about your requirements
See the matching Anjos service for scope and what to expect.
Discuss backup power requirements